Circulating Water Pump & Wash Screen Enclosures
Industry: Power & Energy

PROJECTS
Scope of Work
CCI was contracted by our energy client to provide general contracting and self-perform construction services at the Blue Water Energy Center in East China, Michigan. The project consisted of two independent structures designed to enclose the existing circulating water pumps and provide a wash down process station for the trash screens.
CCI’s civil/concrete and structural divisions lead the project on the front-end by self-performing all sitework, foundations and structural steel erection. Due to the existing site conditions, hydro-excavation was performed to locate and preserve existing utilities. Upon placement of the foundations, CCI’s structural division erected the structure in two separate phases in order to enclose the critical assets prior to winter conditions. In addition to our self-perform activities, six specialty subcontractors were managed under CCI’s supervision. Our ability to coordinate with internal resources allowed our project teams to better control safety, quality and schedule, delivering our client the confidence and certainty critical milestones were achieved as planned.
Throughout the project, CCI worked closely with the owner and architect to ensure all quality, and owner standards were achieved. Our expertise working on critical projects with aggressive schedules enabled our team to complete the work safely without any incidents or disruption to plant operations.