Customer Problem

CCI was contracted based off of a strategic partnership to design, fabricate and install all service rail systems for the new South Paint Shop at the Sterling Heights Assembly Plant. The partnership eliminated the time required for soliciting bids, evaluating and awarding the contract, in turn allowing our customer to gain more time for final closeout.

Customer Solution

CCI served at the turnkey contractor providing all pre-construction services including preliminary engineering, steel fabrication and procurement. In addition, our team self-performed the installation of all white steel, tool rail and hoists.

Customer Results

Due to the site access constraints, the project team separated the steel fabrication and erection into 20 sequences as the project locations were either between or in existing paint systems.